newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu & Kashmir, Trending news | News Mantra
News Mantra: Exclusive

CHANDRAYAN 2 MOVES AHEAD

The first de-orbiting manoeuvre for Vikram Lander of Chandrayaan-2 spacecraft was performed successfully on Tuesday, according to the Indian Space Research Organisation (ISRO). The ISRO informed that the manoeuvre began at 8.50 am (IST) as planned, using the onboard propulsion system. The total duration was four seconds.

The orbit of Vikram Lander is 104 km x 128 km. Chandrayaan-2 Orbiter continues to orbit the Moon in the existing orbit and both the Orbiter and Lander are healthy. The next de-orbiting manoeuvre is scheduled for Wednesday between 3.30 and 4.30 am (IST).The separation of the Vikram Lander from Chandrayaan-2 Orbiter took place on Monday at 13.15 pm (IST). 

The health of the Orbiter and Lander is being monitored from the Mission Operations Complex (MOX) at ISRO Telemetry, Tracking and Command Network (ISTRAC) in Bengaluru with support from Indian Deep Space Network (IDSN) antennas at Bylalu, near Bengaluru. All the systems of Chandrayaan-2 Orbiter and Lander are healthy.

As per the tentative plan, the powered descent will occur on September 7 followed by the Vikram Touch Down on the same day between 1.30 pm and 2.30 pm.The last manoeuvre of Chandrayaan 2 happened on Sunday evening. ISRO chairman Dr K Sivan has noted that the limits of the orbiter, lander, rover are in good condition.

It may be recalled that the fourth Lunar bound orbit manoeuvre for Chandrayaan-2 was performed successfully on Friday using the onboard propulsion system of the spacecraft. The duration of the manoeuvre was 1155 seconds.

Chandrayaan 2 was launched from Satish Dhawan space centre in Sriharikota in Andhra Pradesh by India`s heavy-lift rocket Geosynchronous Satellite Launch Vehicle-Mark III (GSLV Mk III) on July 22. The successful launch was carried out exactly a week after the ISRO had aborted the launch on July 15, just 56 minutes before the launch due to a “technical snag”.The mission includes four components: a GSLV Mk-III, an orbiter, a lander; and the small rover.

Related posts

NISARGA likely to weaken more

Newsmantra

NO postal ballot above 65 yrs

Newsmantra

Support needed from all sides for recovery RBI

Newsmantra

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Privacy & Cookies Policy
377394716