newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu & Kashmir, Trending news | News Mantra
Business

L&T Achieves Breakthrough in India’s Longest Rail Tunnel on Rishikesh-Karnaprayag Rail Line

L&T Achieves Breakthrough in India’s Longest Rail Tunnel on Rishikesh-Karnaprayag Rail Line

Bengaluru, April 21, 2025: Larsen & Toubro has achieved the breakthrough in India’s longest railway tunnel – the 14.57 km Tunnel No. 8 – on the 125-km Rishikesh-Karnaprayag Broad Gauge Rail Link Project of Rail Vikas Nigam Limited (RVNL). Tunnel No. 8 stretches between Devprayag and Janasu in Uttarakhand.

The breakthrough was achieved using a state-of-the-art Single-Shield Tunnel Boring Machine (TBM) named Shakti, of 9.11m diameter, which is also the largest TBM to be deployed in the Himalayan region. Excavating at an average rate of 413 meters per month, 10.4 km of the tunnel was completed with TBMThe New Austrian Tunnelling Method (NATM) was used to complete the remaining 4.11 km of the tunnel.

Celebrating the milestone, Union Railway Minister Mr Ashwini Vaishnaw, in the presence of Uttarakhand Chief Minister Mr Pushkar Singh Dhami, described the achievement as “a testament to India’s engineering strength and the commitment to enhancing railway infrastructure in even the most difficult terrains.”

Chief Minister Mr Dhami highlighted the tunnel’s potential to revolutionise Uttarakhand’s socio-economic landscape by enhancing connectivity to remote areas, boosting tourism and economic growth.

“This significant breakthrough in one of the most challenging terrains, reflects our commitment and strong collaboration between our client RVNL,” said Mr S V Desai, Whole- Time Director & Senior Executive Vice President (Civil Infrastructure), L&T. “This milestone fosters a deep sense of collective achievement within our team, proving that with dedication and innovation, no challenge is insurmountable.”

L&T’s role in RVNL’s 125-km Rishikesh-Karnaprayag Railway Line project which connects Rishikesh, Devprayag, Srinagar, Rudraprayag, Gauchar, and Karnaprayag across five Himalayan districts, cutting travel time from seven hours to two and supporting the Char Dham Yatra, covers Packages 2 and 4.

In Package 4, L&T is building India’s longest railway tunnel (14.5-km upline, 13.1-km downline). Package 2 includes 26.6 km of tunnel excavation, 28 km of tunnel lining, two railway bridges, one road bridge, and embankments.

Background:

Larsen & Toubro is a USD 27 billion Indian multinational enterprise engaged in EPC Projects, Hi-Tech Manufacturing, and Services, operating across multiple geographies. A strong, customer–focused

approach and the constant quest for top-class quality have enabled L&T to attain and sustain leadership in its major lines of business for eight decades.

Related posts

Honda Motorcycle and Scooter India conducts a successful Road Safety Awareness Campaign at Belgaum

Newsmantra

Nikhil Kamath Announces the Second Cohort of WTFund: Meet the 22 Trailblazing Entrepreneurs Shaping India’s Future

Newsmantra

Motorola launches moto g85 5G – disrupts the sub-20k smartphone market in India with  its first 3D curved pOLED 120Hz display in segment, Brilliant  50MP OIS Sony LYTIA ™ 600 Camera, ultra-premium design and moto Smart Connect for effortless file sharing and streaming across devices, at an unbelievable effective starting price of just Rs. 16,999*

Newsmantra

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More