newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu & Kashmir, Trending news | News Mantra
Delhi

ONGC to start oil production from D5 block in May, gas in 2024 at lower rate.

Oil and Natural Gas Corporation’s (ONGC’s) delayed Krishna Godavari basin KG-D5 project is likely to start crude oil production in May this year and gas output a year later, a senior company official said.

Company’s director (offshore) Shri Pankaj Kumar said a floating production unit, called FPSO, which will be used to produce oil, is already in Indian waters. “We estimate oil production should start in May,” he said.

The block is currently producing 1.7 million standard cubic metres per day (mmscmd) of natural gas.

“We will start with 10,000 to 12,000 barrels per day and reach the peak of 45,000 bpd in 2-3 months,” he said, adding some 2 mmscmd of gas would also flow with oil but actual gas output will start in May 2024 when 7-8 mmscmd production is expected.

Financial Express

Related posts

COAL FAMILY STATUE UNVEILED

Newsmantra

CNN-News18 Unveils Exciting On-Air Programming for G7 Summit, Featuring Exclusive Coverage and Insights

Newsmantra

NTPC has become the flag bearer of the industry

Newsmantra