newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu & Kashmir, Trending news | News Mantra
PSU Mantra

NTPC to install 20 GW RE capacity with pumped storage at AP green hydrogen hub

NTPC, which is setting up a more than ₹1 lakh crore green hydrogen hub in coastal Andhra Pradesh, will install 13.4 gigawatts (GW) of solar power and 6.6 GW of pumped storage project (PSP).

Sources said that India’s largest power producer will set up a total of 20 gigawatts (GW) of renewable power capacity, including storage, which will be utilised for manufacturing green hydrogen through electrolysis.

 

Related posts

NTPC Bongaigaon  Record-Breaking Operational Excellence and Community Impact in FY 2025-26

Newsmantra

PESB recommends the name of Shri VIVEK CHANDRAKANT TONGAONKAR for the post of Director (Finance), ONGC

Newsmantra

Govt and ONGC Join Hands to Strengthen Eklavya Model Residential Schools

Newsmantra

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More