Bharat Heavy Electricals Limited (BHEL) has bagged an order from NTPC Ltd. for setting up the 2×800 MW Singrauli Supercritical Thermal Power Plant (STPP) Stage-III on Engineering, Procurement & Construction (EPC) basis.
The plant will be set up adjacent to the existing 2,000 MW thermal power station at Singrauli in Uttar Pradesh.