<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>L&amp;T Heavy Engineering - newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</title>
	<atom:link href="https://newsmantra.in/tag/lt-heavy-engineering/feed/" rel="self" type="application/rss+xml" />
	<link>https://newsmantra.in/tag/lt-heavy-engineering/</link>
	<description>Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &#38; Kashmir, Trending news &#124; News Mantra</description>
	<lastBuildDate>Thu, 21 Aug 2025 12:31:52 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.3</generator>

<image>
	<url>https://newsmantra.in/wp-content/uploads/2019/05/cropped-newmantra-logo-32x32.png</url>
	<title>L&amp;T Heavy Engineering - newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</title>
	<link>https://newsmantra.in/tag/lt-heavy-engineering/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>L&#038;T Heavy Engineering Despatches Steam Generator for Haryana Nuclear Power Plant</title>
		<link>https://newsmantra.in/lt-heavy-engineering-despatches-steam-generator-for-haryana-nuclear-power-plant/</link>
		
		<dc:creator><![CDATA[Newsmantra]]></dc:creator>
		<pubDate>Thu, 21 Aug 2025 12:31:52 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[GHAVP]]></category>
		<category><![CDATA[Gorakhpur Haryana Anu Vidyut Pariyojana]]></category>
		<category><![CDATA[Haryana Nuclear Power Plant]]></category>
		<category><![CDATA[L&T Heavy Engineering]]></category>
		<category><![CDATA[Nuclear Power Plant]]></category>
		<category><![CDATA[Steam Generator]]></category>
		<guid isPermaLink="false">https://newsmantra.in/?p=68098</guid>

					<description><![CDATA[<p>Bengaluru, August 21, 2025: Marking yet another milestone in India’s civil nuclear energy programme, L&#38;T Heavy Engineering has despatched a Steam Generator to the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP), located in Fatehabad district, Haryana. The Steam Generator was ceremonially flagged off from L&#38;T’s state-of-the-art manufacturing facility at Hazira in Gujarat, in the presence...</p>
<p>The post <a href="https://newsmantra.in/lt-heavy-engineering-despatches-steam-generator-for-haryana-nuclear-power-plant/">L&#038;T Heavy Engineering Despatches Steam Generator for Haryana Nuclear Power Plant</a> appeared first on <a href="https://newsmantra.in">newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><b>Bengaluru, August 21, 2025</b>: Marking yet another milestone in India’s civil nuclear energy programme, L&amp;T Heavy Engineering has despatched a Steam Generator to the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP), located in Fatehabad district, Haryana.</p>
<p>The Steam Generator was ceremonially flagged off from L&amp;T’s state-of-the-art manufacturing facility at Hazira in Gujarat, in the presence of NPCIL Chairman &amp; Managing Director Mr Bhuwan Chandra Pathak, Director (Technical) Mr Rajesh Veeraraghavan along with other senior officials of NPCIL and L&amp;T.</p>
<p>This is first of the four Steam Generators that L&amp;T is manufacturing for GHAVP and is meant for its Unit 3 &amp; 4. Notably, the Steam Generator has been despatched seven months ahead of schedule, reinforcing L&amp;T’s reputation for excellence and reliability in nuclear manufacturing.</p>
<p>GHAVP 3&amp;4 are a part of the ten indigenous 700 MWe Pressurised Heavy Water Reactors (PHWRs) being set up in the country in fleet mode by NPCIL.</p>
<p>Speaking at the flag-off ceremony, <b>NPCIL CMD Mr Pathak said</b>: “With a remarkable technology transformation, L&amp;T Heavy Engineering has enhanced both speed and quality of its execution. This is a strong indication of industry preparedness in manufacturing of critical equipment for nuclear power plants and will go a long way to achieve the target of 100 GWe by 2047”.</p>
<p><b>Mr Anil V Parab, Whole-time Director and Senior EVP (Heavy Engineering and Construction Equipment &amp; Industrial Product Design Development, L&amp;T) said</b>: “Heavy Engineering continues to be the industry trendsetter in the manufacture of critical nuclear components. With end-to-end capability as one-stop-shop solution provider, L&amp;T will be a major contributor to India’s 100 GWe nuclear programme of Viksit Bharat &#8211; 2047”.</p>
<p>L&amp;T set a global benchmark by delivering a Steam Generator in just 33 months. L&amp;T has till date delivered 5 steam generators for the 10 X 700 MWe fleet programme.</p>
<p>The post <a href="https://newsmantra.in/lt-heavy-engineering-despatches-steam-generator-for-haryana-nuclear-power-plant/">L&#038;T Heavy Engineering Despatches Steam Generator for Haryana Nuclear Power Plant</a> appeared first on <a href="https://newsmantra.in">newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>L&#038;T Heavy Engineering Wins (Significant*) Orders in India and Abroad</title>
		<link>https://newsmantra.in/lt-heavy-engineering-wins-significant-orders-in-india-and-abroad/</link>
		
		<dc:creator><![CDATA[Newsmantra]]></dc:creator>
		<pubDate>Wed, 08 Jan 2025 13:04:04 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[L&T Heavy Engineering]]></category>
		<guid isPermaLink="false">https://newsmantra.in/?p=53720</guid>

					<description><![CDATA[<p>Bengaluru, January 08, 2025: The Heavy Engineering arm of Larsen &#38; Toubro has won multiple orders in Q3 of FY25 in the overseas and domestic markets. In the overseas market, it secured an order for LNG equipment for a project in the USA. One of the largest LNG project orders, this...</p>
<p>The post <a href="https://newsmantra.in/lt-heavy-engineering-wins-significant-orders-in-india-and-abroad/">L&#038;T Heavy Engineering Wins (Significant*) Orders in India and Abroad</a> appeared first on <a href="https://newsmantra.in">newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Bengaluru, January 08, 2025:</strong> The Heavy Engineering arm of Larsen &amp; Toubro has won multiple orders in Q3 of FY25 in the overseas and domestic markets.</p>
<p>In the overseas market, it secured an order for LNG equipment for a project in the USA. One of the largest LNG project orders, this underscores L&amp;T’s position as a global leader in the heavy engineering sector, leveraging extensive expertise and state-of-the-art manufacturing technology to deliver high-quality LNG equipment.</p>
<p>The business also secured a breakthrough order for a loop reactor in a Propane Dehydrogenation (PDH) Polypropylene (PP) Plant in Turkey. The order is a testament to L&amp;T’s hi-tech manufacturing prowess in the petrochemical segment.</p>
<p>Further, the business has secured a prestigious repeat order from a leading oil &amp; gas customer in Saudi Arabia for a Fluid Catalytic Cracking Unit (FCCU) revamp project. The order reaffirms L&amp;T’s position as a reliable and trusted player in brownfield EPC space, delivering innovative and high-quality solutions for complex revamp projects.</p>
<p>The business has then bagged an order from a prestigious client in Kuwait. This is for the supply of critical components for hydrocracker reactors and high-pressure heat exchangers.</p>
<p>On the domestic front, Heavy Engineering has secured orders for three urea reactors – from Southern Petrochemical Industries Corporation for India’s longest urea reactor, Indian Farmers Fertiliser Cooperative Ltd, and Indorama India Private Ltd. These have taken the number of urea reactor orders that the business has received in recent years to 17 in a row, thus solidifying its dominance in the supply of critical equipment for the fertiliser sector.</p>
<p><strong>Background:</strong></p>
<p>Larsen &amp; Toubro is a USD 27 billion Indian multinational enterprise engaged in EPC Projects, Hi-Tech Manufacturing, and Services, operating across multiple geographies. A strong, customer–focused approach and the constant quest for top-class quality have enabled L&amp;T to attain and sustain leadership in its major lines of business for eight decades.</p>
<table width="0">
<tbody>
<tr>
<td width="95"><strong>Project Classification</strong></td>
<td width="95"><strong>Significant</strong></td>
<td width="95"><strong>Large</strong></td>
<td width="99"><strong>Major</strong></td>
<td width="106"><strong>Mega</strong></td>
<td width="100"><strong>Ultra-Mega</strong></td>
</tr>
<tr>
<td width="95">Value in ₹ Cr</td>
<td width="95">1,000 to 2,500</td>
<td width="95">2,500 to 5,000</td>
<td width="99">5,000 to 10,000</td>
<td width="106">10,000 to 15,000</td>
<td width="100">&gt;15,000</td>
</tr>
</tbody>
</table>
<p>The post <a href="https://newsmantra.in/lt-heavy-engineering-wins-significant-orders-in-india-and-abroad/">L&#038;T Heavy Engineering Wins (Significant*) Orders in India and Abroad</a> appeared first on <a href="https://newsmantra.in">newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
