<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>India 1150 kV Transmission Corridor &#8211; newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</title>
	<atom:link href="https://newsmantra.in/tag/india-1150-kv-transmission-corridor/feed/" rel="self" type="application/rss+xml" />
	<link>https://newsmantra.in</link>
	<description>Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &#38; Kashmir, Trending news &#124; News Mantra</description>
	<lastBuildDate>Fri, 20 Nov 2026 11:44:56 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://newsmantra.in/wp-content/uploads/2019/05/cropped-newmantra-logo-32x32.png</url>
	<title>India 1150 kV Transmission Corridor &#8211; newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</title>
	<link>https://newsmantra.in</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>India Plans First-Ever 1,150 kV Transmission Corridor; ₹68,816-Crore Project to Link Western and Eastern Grids</title>
		<link>https://newsmantra.in/india-1150-kv-transmission-corridor-68816-crore-project/</link>
		
		<dc:creator><![CDATA[Newsmantra]]></dc:creator>
		<pubDate>Fri, 20 Nov 2026 11:44:56 +0000</pubDate>
				<category><![CDATA[Government- press- release]]></category>
		<category><![CDATA[Govt. Mantra]]></category>
		<category><![CDATA[1150 kV Ultra High Voltage Transmission]]></category>
		<category><![CDATA[India 1150 kV Transmission Corridor]]></category>
		<category><![CDATA[India's First 1150 kV Transmission Network]]></category>
		<category><![CDATA[India's Power Grid Infrastructure]]></category>
		<category><![CDATA[Inter-Regional Power Transmission]]></category>
		<category><![CDATA[National Committee on Transmission]]></category>
		<category><![CDATA[NCT India]]></category>
		<category><![CDATA[Western and Eastern Grid Interconnection]]></category>
		<category><![CDATA[Western Region Eastern Region Transmission Corridor]]></category>
		<guid isPermaLink="false">https://newsmantra.in/?p=87088</guid>

					<description><![CDATA[NEW DELHI. In a major breakthrough for India&#8217;s power transmission infrastructure, the National Committee on Transmission (NCT) has recommended the country&#8217;s first-ever 1,150 kV Ultra High Voltage (UHV) AC transmission corridor to connect the Western and Eastern Regions. Estimated to cost ₹68,816 crore, the ambitious project marks a significant leap...]]></description>
										<content:encoded><![CDATA[<p><strong>NEW DELHI</strong>. In a major breakthrough for India&#8217;s power transmission infrastructure, the National Committee on Transmission (NCT) has recommended the country&#8217;s first-ever 1,150 kV Ultra High Voltage (UHV) AC transmission corridor to connect the Western and Eastern Regions. Estimated to cost ₹68,816 crore, the ambitious project marks a significant leap beyond the existing 765 kV transmission network and is aimed at strengthening inter-regional power transfer, supporting large-scale renewable energy integration and meeting rapidly rising electricity demand. The corridor will facilitate the evacuation of surplus generation from Rajasthan, Maharashtra, Chhattisgarh and the North Eastern Region to emerging industrial and energy-intensive demand centres, particularly in Odisha, where green hydrogen, green ammonia and data centre projects are driving consumption growth.</p>
<p>The proposed scheme, titled &#8220;Ultra High-Capacity Transmission Corridor (1150 kV) for Interconnection of WR and ER and Associated Interconnections&#8221;, will be implemented in three packages under the Tariff Based Competitive Bidding (TBCB) route, with all three packages to be awarded simultaneously and each having a 72-month implementation period. Part-A, estimated at ₹18,000 crore, envisages 1,150/400 kV substations at Raigarh Kotra-III, Bolangir and Godipada, along with associated transmission lines. Part-B, costing approximately ₹17,000 crore, includes new substations at Rourkela and Kolaghat, 1,150 kV double-circuit lines and associated 400 kV and 765 kV transmission links. Part-C, involving an investment of ₹33,816 crore, will establish a 6,000 MW, ±800 kV VSC-based HVDC link spanning approximately 1,275 km between Bhadla-IV and Raigarh Kotra-III, along with a new pooling station at Bhadla-IV.</p>
<p>The proposed 1,150 kV network is designed to offer a thermal transfer capability of around 14,000 MVA, significantly enhance power-carrying capacity, optimise scarce Right-of-Way and reduce transmission losses and dependence on multiple EHV corridors. With approximately 1,056 km of 1,150 kV double-circuit lines, the project is expected to strengthen national grid integration and provide a high-capacity transmission backbone for India&#8217;s evolving energy landscape. The proposal has received support from the Eastern, Western and Northern Regional Power Committees (ERPC, WRPC and NRPC).</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
