<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>BRS21 - newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</title>
	<atom:link href="https://newsmantra.in/tag/brs21/feed/" rel="self" type="application/rss+xml" />
	<link>https://newsmantra.in/tag/brs21/</link>
	<description>Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &#38; Kashmir, Trending news &#124; News Mantra</description>
	<lastBuildDate>Wed, 30 Apr 2025 08:04:58 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.3</generator>

<image>
	<url>https://newsmantra.in/wp-content/uploads/2019/05/cropped-newmantra-logo-32x32.png</url>
	<title>BRS21 - newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</title>
	<link>https://newsmantra.in/tag/brs21/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Coal India Commissions India&#8217;s First Electric rope shovel at NCL Nigahi Project.</title>
		<link>https://newsmantra.in/coal-india-commissions-indias-first-electric-rope-shovel-at-ncl-nigahi-project/</link>
		
		<dc:creator><![CDATA[Newsmantra]]></dc:creator>
		<pubDate>Wed, 30 Apr 2025 08:04:58 +0000</pubDate>
				<category><![CDATA[PSU Mantra]]></category>
		<category><![CDATA[Aatmanirbhar Bharat]]></category>
		<category><![CDATA[BEML Limited]]></category>
		<category><![CDATA[BRS21]]></category>
		<category><![CDATA[Coal India]]></category>
		<category><![CDATA[NCL Nigahi Project]]></category>
		<guid isPermaLink="false">https://newsmantra.in/?p=61611</guid>

					<description><![CDATA[<p>BEML Limited launched India&#8217;s largest indigenously designed electric rope shovel, the BRS21, for opencast mining. This 720-ton, zero-emission machine, with a 21-cubic-meter bucket, was handed over to Northern Coalfields Ltd. The development of BRS21 in 24 months signifies a step towards sustainable and self-reliant mining solutions, aligning with the Aatmanirbhar...</p>
<p>The post <a href="https://newsmantra.in/coal-india-commissions-indias-first-electric-rope-shovel-at-ncl-nigahi-project/">Coal India Commissions India&#8217;s First Electric rope shovel at NCL Nigahi Project.</a> appeared first on <a href="https://newsmantra.in">newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>BEML Limited launched India&#8217;s largest indigenously designed electric rope shovel, the BRS21, for opencast mining. This 720-ton, zero-emission machine, with a 21-cubic-meter bucket, was handed over to Northern Coalfields Ltd. The development of BRS21 in 24 months signifies a step towards sustainable and self-reliant mining solutions, aligning with the Aatmanirbhar Bharat vision. BEML said the BRS21 rope shovel is entirely designed, engineered, and manufactured in India.According to BEML, the high-capacity electric rope shovel is purpose-built for large-scale overburden removal in opencast mining operations.</p>
<p>Apart from above ,  Coal India announced the commissioning of India’s first indigenously developed electric rope shovel at Nigahi Project of  Northern Coalfields Limited (NCL), in Singrauli, Madhya Pradesh.</p>
<p>The handing-over and commissioning ceremony of this state-of-the-art shovel &#8211; manufactured by Bharat Earth Movers Limited (BEML) &#8211; witnessed the presence of Chairman, Shri P.M. Prasad; Director (HR), Dr. Vinay Ranjan; Director (Technical), Shri Achyut Ghatak; CMD, BEML, Shri Shantanu Roy; CMD, NCL, Shri B. Sairam; and senior management from Coal India, NCL, and BEML, both physically and virtually.</p>
<p>Chairman, Shri Prasad, described the induction of this shovel into Coal India’s HEMM fleet as a significant step towards Aatmanirbhar Bharat. He also lauded the strong work culture at NCL and expressed confidence that the new machine would be utilized to its optimum capacity.</p>
<p>This 20-cubic-meter electric rope shovel features a robust high-tensile bucket and boom design, a fully air-conditioned ergonomic operator cabin, and an impressive annual production capacity of 4.45 million cubic meters. It is also equipped with real-time monitoring and diagnostics with integrated safety and fault protection systems.</p>
<p>The post <a href="https://newsmantra.in/coal-india-commissions-indias-first-electric-rope-shovel-at-ncl-nigahi-project/">Coal India Commissions India&#8217;s First Electric rope shovel at NCL Nigahi Project.</a> appeared first on <a href="https://newsmantra.in">newsmantra.in l Latest news on Politics, World, Bollywood, Sports, Delhi, Jammu &amp; Kashmir, Trending news | News Mantra</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
